Execution of works to ensure power supply for biofuel pellet production plant

VOLTAGE performed a scope of design, construction, installation and commissioning works on the power supply of the enterprise:

• construction of 10 kV overhead line;

• construction of Transformer Substation

  2x1600  kVA 10 / 0,4 kV;

• installation of busbars 2500 A;

• installation of external and internal power electric networks and electric lighting networks;

• installation of cable networks for low-current systems;

• installation of lightning protection;

installation of automation networks of technological equipment.

 

Location of the object: Vinnytsia region Turbines.

Customer: Vin-Peleta LLC (SMART Holding)